2" no problem. Finding the front 2 mounts in the engige bay is fun :oops:
Uncoil brake pipes in engine bay as lifting,
Make sure heater pipe connectors at back of engine bay, against the bulk head are TIGHT as there will be extra strain put on the joins, ( i didn't and lost all my coolant). :oops:
And i had to turn the top of my T-case lever gaitor in on its self as the excess rubber was making it hard to select 2wd.
Total cost was £17.50 :shock:
A bit of scaffold tube cut to 2" x 8 (12 for LWB)
8 x 150mm M10 high tensile nuts and bolts (12 for LWB) (nylon locker nuts ;) )
And three cutting discs for the scaffy tube :dance:
Works a treat
Hace fun its really easy to do
HTH