Mud-club
Chat & Social => The Bar - General Chat => Topic started by: bezzabsa on February 24, 2007, 15:01:39
-
All I can say is WOW..what a difference :shock:
cheers for a Job well done - even tho' i had to make my own tea ;) :D:D:D
Not too much smoke - and a hell of a lot more poke low down, just need to save for those Niggly bits now ;)
-
What was done then? Could do with a bit more poke in mine low down.
-
What was done then? Could do with a bit more poke in mine low down.
Oooer Missus! :wink:
-
What was done then? Could do with a bit more poke in mine low down.
Full list of what was done is:-
CAMBELT CHANGE - INC FOLLOWERS
FULL SERVICE
ALL FLUIDS AND LEVELS CHECKED / RENEWED
FULL UNDERBODY CHECK
E.G.R. BLANKED
PUMP TWEAKED (FUELLING & TURBO )
found out that i have 2 suspect wheel bearings - 1 rear propshaft Doughnut gone
1 patch of welding on O/S outer sill
weap from rear crank seal
1 shocker bush knackered..
But Boot floor is solid, as is rear cross member :D:D:D
overall for what I paid for the diaco i'm happy...epecially happy with what I paid for the service ;) :D:D:D:D:D:D:D:D:D:D:D
-
What was done then? Could do with a bit more poke in mine low down.
Oooer Missus! :wink:
:roll:
-
Glad your happy mate, drop me line and i can book you in for the other bits and bobs to suit you , many thanks :D :D :D