Mud-club
Vehicle & Technical => Discovery => Topic started by: Rangierover on December 19, 2008, 18:17:31
-
Hi guys happy Christmas, As in the title really Ive got to do a heater matrix on my mums 300 and was wondering what Ive got myself into is it a really bad job?? and how long would you give to complete it?
Cheers Ali
-
Hi, Dash out, heater box out, swop over the matrix, takes me about three hours, but i have done a few in my time, budget on a days work,
-
whole dash out?? :shock:
-
Yeap, typically I think cars are assembled like this, paint it, fit the wiring loom, fit the heater matrix, fit everything else later. :roll:
-
Yes mate all out, only way to do it, ive tryed cheating, but never worked,